Waterways Drainage Specialists
Another SWW compliant pipework installation
- April 28
During an extension build over South West Water asked this builder to remove the open access chamber and replace with closed pipe work, removing any risk of internal flooding. We have the required qualifications, risk assessments and method statements necessary to satisfy SWW sewer connections and inspections.