a27d24_b6263a7c3a9e4afeb8ed703c30d7612e_mv2
Waterways Drainage Specialists

Waterways Drainage Specialists

Another SWW compliant pipework installation

During an extension build over South West Water asked this builder to remove the open access chamber and replace with closed pipe work, removing any risk of internal flooding. We have the required qualifications, risk assessments and method statements necessary to satisfy SWW sewer connections and inspections.

Share this post